Extended Well Testing system
This EWT skid was built in 2013 for a project which got cancelled. The work was not 100% complete and some refurbishment will be required to bring this to an operating state however this is offered for a heavily discounted sale price.
Details
This Extended Well Test or Early Production System was developed for the oil and gas industry to deliver a compact, efficient and cost effective separation system with high reliability. The following are the main features of the system :
> Highly efficient 3-phase separation
> Integrated LP Separator and Flare Scrubber
> Min. Instrumentation, control and shutdowns
> Eliminates the requirement for excessive pumps
> High system reliability and availability
> Compact with low CAPEX and OPEX
This skid is suitable to be utilized in early production systems on offshore jack-up rigs, where the topside facilities will include primarily the crude separation train as well as the accompanying auxiliary systems :
> flaring system
> produced water system
> open & closed drain systems
> utility systems
> slop tank.
The EWT skid is designed to the following field production capacities :
> Max. Oil Production : 10,000 Bopd
> Max. Produced Water : 3,000 Bwpd
> Max. Total Liquid : 13,000 Blpd
> Max. Associated Gas : 8 mmscfd
> Max. Produced Water : 3,000 Bwpd
> Max. Total Liquid : 13,000 Blpd
> Max. Associated Gas : 8 mmscfd
Show more
Show less