Extended Well Testing system

This EWT skid was built in 2013 for a project which got cancelled. The work was not 100% complete and some refurbishment will be required to bring this to an operating state however this is offered for a heavily discounted sale price.

Details

This Extended Well Test or Early Production System was developed for the oil and gas industry to deliver a compact, efficient and cost effective separation system with high reliability. The following are the main features of the system :
         > Highly efficient 3-phase separation
         > Integrated LP Separator and Flare Scrubber
         > Min. Instrumentation, control and shutdowns
         > Eliminates the requirement for excessive pumps
         > High system reliability and availability
         > Compact with low CAPEX and OPEX

This skid is suitable to be utilized in early production systems on offshore jack-up rigs, where the topside facilities will include primarily the crude separation train as well as the accompanying auxiliary systems :
         > flaring system
         > produced water system
         > open & closed drain systems
         > utility systems
         > slop tank.

The EWT skid is designed to the following field production capacities :
         > Max. Oil Production       : 10,000 Bopd
         > Max. Produced Water   : 3,000 Bwpd
         > Max. Total Liquid           : 13,000 Blpd
         > Max. Associated Gas    : 8 mmscfd
Show more
Show less
MAIN DETAILS
Manufacturer
TBC/Unknown
LISTING ID
2963
Year built
2013
Location
Asia Pacific
CONTACT SELLER

If you are already registered go to Sign in page.

Thank you for your enquiry. You will hear soon from us.
Typically replies in 24 hours